Logo Eventkampus
Perpustakaan judul masih dalam tahap pengembangan, admin siap menampung kritik dan saran
OPTIMASI PENJADWALAN PROYEK MENGGUNAKAN ALGORITMA GENETIKA
EKO SETIYANTO (2007) | Skripsi | Teknik Informatika , Teknik Informatika
Bagikan
Ringkasan
Scheduling is the form of policy corps to determine process which must be done and how long the processes walk. Constitute is difficult to optimate time of solving of an existing project so that can pursue process workmanship of other projects. Difficulty in determining which project must be done beforehand and remember the limited available resource. Genetic Algorithm is used to schedule workmanship of project with limited life. This algorithm require parameter of genetic and use operator of genetic like selection, mutation and crossover to yield a makespan minimation output. From the minimize makespan then we got a sequence scheduling of optimum project.
Ringkasan Alternatif
Scheduling is the form of policy corps to determine process which must be done and how long the processes walk. Constitute is difficult to optimate time of solving of an existing project so that can pursue process workmanship of other projects. Difficulty in determining which project must be done beforehand and remember the limited available resource. Genetic Algorithm is used to schedule workmanship of project with limited life. This algorithm require parameter of genetic and use operator of genetic like selection, mutation and crossover to yield a makespan minimation output. From the minimize makespan then we got a sequence scheduling of optimum project.
Sumber